Renewable Energy: Biogas

OpMetriks engineers have extensive experience in the design, commissioning and handover of the electrical, control system and process interfaces for numerous Cogeneration power plants. These include both biogas plants at sewerage treatment plants and power stations fired by Coal Seam Gas (CSG).

Project sizes range from single units of a few hundred Kw up to 1Mw at sewerage plants, to multiple units in parallel configuration in CSG power plants to 30+ Mw.

Systems included both mains parallel systems and mains independent systems in remote locations with black-start capability.